FG to Restore Abuja-Kaduna Rail Line in 10 Days After Derailment

The Federal Government announced the restoration of the Abuja-Kaduna rail line within 10 days following a recent derailment. Minister of Transportation, Saidu Alkali, inspected the accident site and commended the Nigerian Railway Corporation (NRC) for their swift response.
The restoration efforts involve repairing a 150-meter stretch of damaged track. An investigation team, including engineers from the Ministry of Transportation, NRC, and China Civil Engineering Construction Corporation (CCECC), is working to determine the cause of the derailment.
The Minister expressed gratitude for the support received and assured that the rail line will be operational within the specified timeframe.
Plus234Feed summary based on reporting from Politics Nigeria. Read the original report below.
Read full article
Continue on Politics Nigeria
Get the week in one email
Top stories, NPFL results, the naira — every Friday morning. Free, one email a week.
Related Stories

Abuja-Kaduna Train Service to Resume After Derailment Incident - NRC Ensures Safety and Passenger Welfare

NRC Commences Safety Assessment of Abuja-Kaduna Rail for Resumption.

NRC suspends Abuja-Kaduna train services after derailment

Abuja-Kaduna Train Service to Resume Next Week After Safety Checks

BREAKING: NRC Suspends Abuja-Kaduna Train Services After Derailment

NSIB Reveals 23-Day Timeline for Abuja-Kaduna Train Accident Report
Get Plus234Feed on messaging apps
Same headlines, delivered where you already scroll.






