NRC Commences Safety Assessment of Abuja-Kaduna Rail for Resumption.

The Nigerian Railway Corporation (NRC) has initiated a safety assessment of the Abuja-Kaduna rail line starting on September 24. This assessment aims to ensure the corridor meets the highest safety standards following a recent train derailment on August 26.
NRC Managing Director, Kayode Opeifa, confirmed that a team of engineers has been evaluating the repaired sections and critical infrastructure along the route. The corporation is focused on resuming operations safely, with the first line already repaired and operational while the second line undergoes necessary repairs.
Safety remains a top priority for NRC, emphasizing the importance of thorough inspections before resuming full operations.
Plus234Feed summary based on reporting from The Will. Read the original report below.
Read full article
Continue on The Will
Get the week in one email
Top stories, NPFL results, the naira — every Friday morning. Free, one email a week.
Related Stories

NRC suspends Abuja-Kaduna train services after derailment

Abuja-Kaduna Train Service to Resume Next Week After Safety Checks

FG to Restore Abuja-Kaduna Rail Line in 10 Days After Derailment

NRC Must Prevent Future Train Mishaps — Tinubu

Nigerian Railway Corporation to Revamp National Train Services Nationwide

NSIB Blames Poor Maintenance for Abuja-Kaduna Train Derailment
Get Plus234Feed on messaging apps
Same headlines, delivered where you already scroll.






