FAAN to Temporarily Shut Down Lagos Airport Terminal for Major Rehabilitation in March 2026

The Federal Airports Authority of Nigeria (FAAN) has revealed plans to temporarily close Terminal 1 at the Murtala Muhammed International Airport in Lagos in March 2026. The shutdown is necessary to facilitate extensive rehabilitation and expansion works aimed at resolving longstanding structural and operational challenges.
The closure is expected to last for one month as part of efforts to modernize the terminal to meet international standards. The decision follows a series of incidents caused by faults in the electrical supply system, prompting the need for reconstruction work that commenced on September 4, 2025.
The Nigerian government had earlier approved N712 billion for the refurbishment and modernization of Terminal 1. FAAN acknowledges the inconveniences the closure may cause but emphasizes the long-term benefits of the comprehensive rehabilitation project.
Plus234Feed summary based on reporting from Legit.ng. Read the original report below.
Read full article
Continue on Legit.ng
Get the week in one email
Top stories, NPFL results, the naira — every Friday morning. Free, one email a week.
Related Stories

Nigerian Government to Close Lagos Airport Terminal for Two-Year Rehabilitation

FAAN Apologizes for Power Outage at Lagos Airport Terminal, Explains Cause

FAAN to Rebuild Burnt Terminal at Lagos Airport in 22 Months

FAAN Apologizes for Lagos Airport Power Outage, Explains Cause

Fire Outbreak at MMIA Terminal 1, No Casualties Reported

Fire at Lagos Airport Leads to Temporary Shutdown
Get Plus234Feed on messaging apps
Same headlines, delivered where you already scroll.






