Plus234Feed

Shekarau Leads Arewa for Asiwaju to Support Tinubu's Bid

The Arewa for Asiwaju (A4A) movement has been formed to mobilize support for the re-election of President Bola Ahmed Tinubu. It operates across all 19 Northern states and the Federal Capital Territory (FCT) with a structured leadership framework.

The movement is led by a 14-member Board of Trustees (BOT), chaired by Sen. Ibrahim Shekarau, with Sen. Ibrahim Geidam and Barr Simon Bako Lalong serving as deputies. Other BOT members include notable political figures such as Alh.

Ibrahim Kabir Masari, Sen. Joshua Dariye, and Brig. Gen. Buba Marwa (rtd). The National Directorate is headed by Mohammed Badaru Abubakar as Director General, supported by three Deputy National Coordinators.

Various directorates have been established to manage operations, communications, finance, and mobilization, with specific individuals appointed to lead these efforts. The movement aims to consolidate political support in the North for the upcoming elections.

Plus234Feed summary based on reporting from Daily Trust. Read the original report below.

Read full article

Continue on Daily Trust

Visit
Share

Enjoy this article?

Get the weekly Nigerian roundup — top stories, NPFL, naira. One email, Sunday morning.

Free · one email per week · unsubscribe anytime

Related Stories

Get Plus234Feed on messaging apps

Same headlines, delivered where you already scroll.