FG Closes River Niger Bridge for Repairs Amid Vandalism

On Friday, the Federal Government announced the closure of the River Niger bridge for one week to conduct repairs on vandalized sections and install security measures. Engr Dave Umahi, the Minister for Works, made this announcement during an inspection in Ogbunike, Anambra.
The bridge, over 50 years old, has suffered from vandalism, with vital bolts and irons stolen, posing a risk of collapse. During the closure, motorists will be redirected to the Second Niger Bridge to allow contractors to perform repairs.
Umahi emphasized the need for immediate action, including the removal of the entire asphalt and installation of solar lights and CCTV linked to the Second Niger Bridge for enhanced security. He noted the accumulated workload on the bridge and the necessity of addressing it to prevent traffic gridlock.
The repairs are expected to commence promptly, with a focus on ensuring safety and preventing future vandalism.
Plus234Feed summary based on reporting from Nigerian Tribune. Read the original report below.
Read full article
Continue on Nigerian Tribune
Enjoy this article?
Get the weekly Nigerian roundup — top stories, NPFL, naira. One email, Sunday morning.
Related Stories

First Niger Bridge Closed for Emergency Repairs Until Sept 21

Federal Government Closes First Niger Bridge for Repairs

Anambra Police Enhance Security Amid Niger Bridge Closure

FRSC Enhances Traffic Management for First Niger Bridge Closure

Traffic Disruptions as Kara Bridge Repairs Begin

FERMA to Close Lagos-Ibadan Bridge for Repairs
Get Plus234Feed on messaging apps
Same headlines, delivered where you already scroll.









