FG Closes River Niger Bridge for Repairs Amid Vandalism

On Friday, the Federal Government announced the closure of the River Niger bridge for one week to conduct repairs on vandalized sections and install security measures. Engr Dave Umahi, the Minister for Works, made this announcement during an inspection in Ogbunike, Anambra.
The bridge, over 50 years old, has suffered from vandalism, with vital bolts and irons stolen, posing a risk of collapse. During the closure, motorists will be redirected to the Second Niger Bridge to allow contractors to perform repairs.
Umahi emphasized the need for immediate action, including the removal of the entire asphalt and installation of solar lights and CCTV linked to the Second Niger Bridge for enhanced security. He noted the accumulated workload on the bridge and the necessity of addressing it to prevent traffic gridlock.
The repairs are expected to commence promptly, with a focus on ensuring safety and preventing future vandalism.
Plus234Feed summary based on reporting from Nigerian Tribune. Read the original report below.
Read full article
Continue on Nigerian Tribune
Get the week in one email
Top stories, NPFL results, the naira, every Friday morning. Free, one email a week.
Related Stories

Federal Government to Reopen First Niger Bridge Next Week

First Niger Bridge Closed for Emergency Repairs Until Sept 21

Federal Government Closes First Niger Bridge for Repairs

Niger Bridge Closure Extended; Umahi Vows No Reopening Until Work Done

Heavy Rain Delays First Niger Bridge Reopening by a Week

Federal Ministry of Works Confirms Imminent Reopening of First Niger Bridge
Get Plus234Feed on messaging apps
Same headlines, delivered where you already scroll.









